Meanwell Driver LEDs 100w led post top light fixture --L
Hello, dear portetial buyer, this is Elly from Bbier. We bbier ligthing Co, ltd(bbiermfg.en.made-in-china.com)It is an international photoelectric technology industry company which is specialized in developing, designing, producing LED products, and providing professional lighting engineering solutions and integrated services.
Welcome logo on our zone for more details of Replacement led for hiway led bulbs. Hope we will be entry into business relationship in soonest.
2016 new led bulbs, it can be saving the cost only by replace inside kit----we use the fins heat sink and meanwell driver in the square street light fixture. Put the LED retrofit kits into fixture.
Welcome visit our website:
Http: //bbiermfg.en.made-in-china.com/E40-LED-Retrofit-light-CE-RoHS. Html
For more details.
Application:
1. Tunnel, Subway, Underground Lighting;
2. Gymnasium, Sports Stadium Lighting;
3. Building, Billboard Lighting;
4. Gas Station, Garage Lighting;
5. Park, Garden Lighting;
6. Workshop, Factory Lighting;
7. Warehouse, Storage Lighting;
8. Yard, Square Lighting;
9. Road, Highway Lighting;
10. Station, Dock Lighting etc
40watt 60watt 80watt 100watt 120watt and 150watt avaliable.
How to install the ETL DLC LED retrofit kit into the traditional fixtures?
1). Fix the LED retrofit kit
2). Remove the plastic cover from the LED head
3). Remove the existing component reflector and ballast
4). Put the driver in the place of the previous ballast
5). Mount the LED retrofit kit into the socket
6). Connect the electric wires
Remark: USE A LICENSED ELECTRICIAN TO PERFORM THE INSTALLATION
MOQ: 2 PCS
OEM ODM, customer logo
Lead time: 3--7 days
Trade term: EXW Shenzhen
Shipping: Express(EMS, FedEx, DHL, UPS etc), Air or Sea
Price terms: EXW, FOB, acceptable.
5 years warranty.
Any question, pls feel free let me know.
OEM accepted.
We aim to provide Top Level Customer Service,
We will work with you to solve any problems.
Should any wattage or other lamps you are intersted in, pls keep me contacted.
We are always ready to cooperate with you.
Quality control:
All of materials will be tested before receiving, 100% led light finished will be kept for 24 hours to test its quality reliability, after it is cool will test 100% led light to see if still work well, Each light should pass all the QC procedures before shipping to customer.
Our service:
1. Your inquiry related to our products or prices will be replied in 24hours.
2. Well-trained and experienced staffs to answer all your enquires in fluent English
3. OEM&ODM, any your customized lightings we can help you to design and put into product.
4. Protection of your sales area, ideas of design and all your private information
5. The ability of monthly develop new product can help you enlarge your market.
Welcome logo on our webstie:
bbiermfg.en.made-in-china.com
For more products details. Shoulw any products you are intersted in, pls let me know.
Below is my contact info:
Tel: 0086 188 2016 5753
Counting on your inquiries. Thank you.
You can email me or call me or send me information from skype
Wattage |
30 |
60 |
80 |
100 |
Lumens |
3000 |
6000 |
8000 |
10000 |
Replacement(cfl) |
90 |
180 |
240 |
300 |